Circle Line 6 - Closing the Loop

Circle Line 6 - Closing the Loop 6
Circle Line 6 - Closing the Loop 7

Source: https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/circle_line_6.html

The Reef at King’s Dock

Circle Line 6 Closing the Loop System of Circle Line 6 Anticipate even more direct routes to the Central Business District, Marina Bay and the HarbourFront area. The Circle Line 6 (CCL6) extension will add three stations between HarbourFront and Marina Bay MRT stations, closing the loop for CCL. The stations are: Keppel, Cantonment and Prince Edward Road. The whole CCL will link to all or any existing train lines and shorten travel time, while also giving commuters more alternative routes that bypass the busy interchanges at City Hall and Raffles Place. This will bring the full total amount of CCL stations to 33, including 12 interchange stations that connect with other MRT Lines. Latest Updates The alignment of the Circle Line 6 (CCL6) was announced in October 2015 and construction works for the three final stations in the southern part of Singapore commenced in April 2018 with the installation of earth retaining walls and stabilising structures for the station boxes, depot and tunnels is progressing smoothly. Thereafter, excavation works are anticipated to commence in mid-2019. In May 2017, public was invited to submit ideas for the naming of the six CCL stations. About 1,950 participants subsequently voted in a public polling exercise. The finalised station names are “Keppel”, “Cantonment” and “Prince Edward Road&rdquo ;.Location of Stations Keppel MRT station footprint Keppel Cantonment MRT station footprint Cantonment Prince Edward MRT station footprint Prince Edward Road Key Facts No. of stations icon Amount of stations 3 Period of rail line icon Length of line 4km Expected project completion icon Expected completion 2025 A complete of 11 new Circle Line trains will be included with cater for extra capacity for the CCL6 operations in 2025. This increases the existing CCL fleet by 17 per cent from 64 to 75 trains. Manufactured and assembled in Spain, the brand new trains could have these features: Condition Monitoring System where the system gathers data from equipment on the trains, allow continuous monitoring of the healthiness of the equipment and for predictive maintenance for the trains; Automatic Track Inspection (AIT) System where the system enables monitoring of the running rails, track equipment and sleepers, identifies components that need maintenance and supplements existing track inspection activities; Current Collector Shoe Dislodgement Detection where current collector shoes is going to be designed with sensors to enable the operator to react promptly and take necessary measures if any dislodgement is detected. Did You Know? Did you know icon CCL6 will soon be built-in areas which can be fairly dense and near to heritage sites. Therefore, special efforts are now being made to make sure that the works don’t affect buildings with historical and architectural significance. Cantonment MRT station has been sensitively integrated with the old Tanjong Pagar Railway Station (which is gazetted as a national monument). To facilitate construction, several parts of the former railway station’s train platforms is likely to be removed. LTA and the Urban Redevelopment Authority are seeking advice from the heritage consultant and members of the heritage community on possible solutions for the affected platforms. To cater for future needs, Kim Chuan Depot is likely to be expanded to almost double its capacity from 70 to 133 trains. The integrated depot will house 550 buses, that may allow us to optimise land use. The depot will be completed at the same time as CCL6 in 2025. News Releases Fact Sheet: Circle Line 6 Construction to get into Full Swing Joint release by the LTA & Singapore Land Authority – Circle Line 6 – becoming a full circle Land Transport Authority

Book An Appointment to view The Reef at King's Dock ShowFlat & get VVIP Discounts (Limited Time), Direct Developer Price, & Hardcopy E-Brochure. Guaranteed with Best Price Possible.

OR

Fill up the form on the right and get a copy of The Reef at King's Dock Price, E-Brochure, and Latest Updates!

 Strictly no spam policy.

The Reef at King's Dock

    (You may select more than one unit type)
  • This field is for validation purposes and should be left unchanged.
error:
+ +
Chat Now!
1
Hello! Thank you for visiting
🌊⚓️ The Reef at King’s Dock⚓️🌊

Singapore's 1st Floating Deck In Residential Development
At the ❤️ of GREATER SOUTHERN WATERFRONT!

Lᴀsᴛ 31 ᴜɴɪᴛs
‼️ $68K DISCOUNT FOR ALL 3 BEDROOMS UNITS

⭐️ RCR Waterfront Living With Very Attractive Prices From $2317psf ⭐️

ATTRACTIVE PRICES

🎈1 Br SOLD OUT! 💯
🎈1 +S SOLD OUT! 💯
🎈2 Br SOLD OUT! 💯
🎈2 +S SOLD OUT! 💯

🎈Last 2 units of 2 Bedrooms
$2,297,000 $2601psf 🌊
$2,366,000 $2414psf 🌊

🎈3 Bedrooms + Study
From $2,717,620 $2526psf 🌊

🎈3 Bedrooms Premium
From $2,818,000 $2317psf 🌊

🎈3 Bedrooms Villa
From $3,521,000 $2618psf 🌊

𝔸 ℕ𝕖𝕨 ℝ𝕖𝕚𝕘𝕟 𝕆𝕗 𝕎𝕒𝕥𝕖𝕣𝕗𝕣𝕠𝕟𝕥 𝕃𝕚𝕧𝕚𝕟𝕘
4️⃣2️⃣9️⃣ Units of 1 - 3 bedrooms

🌟99 Years Lease Commence From 12/01/2021🌟

🔸True Waterfront Living
🔹Right In The Heart of Great Southern Waterfront
🔸Next to Singapore Largest Mall, VivoCity
🔹Seamlessly Connected to Harbourfront MRT
🔸First Mover Advantage With High Potential Upside
🔹By Reputable Developers Mapletree And Keppel Land

Viewing by Appointment
Chat with us Now to find out more!