Circle Line 6 - Closing the Loop

Circle Line 6 - Closing the Loop 6
Circle Line 6 - Closing the Loop 7

Source: https://www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/circle_line_6.html

The Reef at King’s Dock

Circle Line 6 Closing the Loop System of Circle Line 6 Anticipate even more direct routes to the Central Business District, Marina Bay and the HarbourFront area. The Circle Line 6 (CCL6) extension will add three stations between HarbourFront and Marina Bay MRT stations, closing the loop for CCL. The stations are: Keppel, Cantonment and Prince Edward Road. The entire CCL will link to all existing train lines and shorten travel time, while also giving commuters more alternative routes that bypass the busy interchanges at City Hall and Raffles Place. This provides the full total quantity of CCL stations to 33, including 12 interchange stations that connect with other MRT Lines. Latest Updates The alignment of the Circle Line 6 (CCL6) was announced in October 2015 and construction works for the three final stations in the southern section of Singapore commenced in April 2018 with the installing of earth retaining walls and stabilising structures for the station boxes, depot and tunnels is progressing smoothly. Thereafter, excavation works are expected to commence in mid-2019. In May 2017, public was invited to submit recommendations for the naming of the six CCL stations. About 1,950 participants subsequently voted in a public polling exercise. The finalised station names are “Keppel”, “Cantonment” and “Prince Edward Road&rdquo ;.Location of Stations Keppel MRT station footprint Keppel Cantonment MRT station footprint Cantonment Prince Edward MRT station footprint Prince Edward Road Key Facts No. of stations icon Amount of stations 3 Length of rail line icon Amount of line 4km Expected project completion icon Expected completion 2025 An overall total of 11 new Circle Line trains is likely to be put into cater for extra convenience of the CCL6 operations in 2025. This increases the existing CCL fleet by 17 per cent from 64 to 75 trains. Manufactured and assembled in Spain, the new trains will have the next features: Condition Monitoring System where the device gathers data from equipment on the trains, to enable continuous monitoring of the fitness of the gear and for predictive maintenance for the trains; Automatic Track Inspection (AIT) System where the machine enables monitoring of the running rails, track equipment and sleepers, identifies components that need maintenance and supplements existing track inspection activities; Current Collector Shoe Dislodgement Detection where current collector shoes is likely to be equipped with sensors allow the operator to react promptly and take necessary measures if any dislodgement is detected. Did You Know? Did you understand icon CCL6 is going to be built in areas which can be fairly dense and near to heritage sites. As such, special efforts are now being made to ensure that the works don’t affect buildings with historical and architectural significance. Cantonment MRT station has been sensitively integrated with the old Tanjong Pagar Railway Station (which is gazetted as a national monument). To facilitate construction, several parts of the former railway station’s train platforms will undoubtedly be removed. LTA and the Urban Redevelopment Authority are seeking advice from a heritage consultant and members of the heritage community on possible solutions for the affected platforms. To cater for future needs, Kim Chuan Depot is likely to be expanded to almost double its capacity from 70 to 133 trains. The integrated depot will house 550 buses, that may allow us to optimise land use. The depot will undoubtedly be completed at once as CCL6 in 2025. News Releases Fact Sheet: Circle Line 6 Construction to enter Full Swing Joint release by the LTA & Singapore Land Authority – Circle Line 6 – learning to be a full circle Land Transport Authority

Book An Appointment to view The Reef at King's Dock ShowFlat & get VVIP Discounts (Limited Time), Direct Developer Price, & Hardcopy E-Brochure. Guaranteed with Best Price Possible.

OR

Fill up the form on the right and get a copy of The Reef at King's Dock Price, E-Brochure, and Latest Updates!

 Strictly no spam policy.

The Reef at King's Dock

    (You may select more than one unit type)
  • This field is for validation purposes and should be left unchanged.
error:
+ +
Chat Now!
1
Hello! Thank you for visiting
🌊⚓️ The Reef at King’s Dock⚓️🌊

Singapore's 1st Floating Deck In Residential Development
At the ❤️ of GREATER SOUTHERN WATERFRONT!

🚇ENJOY UNRIVALLED CONNECTIVITY AND CONVENIENCE!
🏖 ENJOY TRUE WATERFRONT LIVING!
💥 FENGSHUI AT ITS BEST WITH WATER INFRONT AND MOUNTAIN BEHIND! * *靠山面海☀️☀️

😱😱 From Only $21xx PSF!!
🔥Over 91% SOLD! 37 Units Left! 🔥

𝔸 ℕ𝕖𝕨 ℝ𝕖𝕚𝕘𝕟 𝕆𝕗 𝕎𝕒𝕥𝕖𝕣𝕗𝕣𝕠𝕟𝕥 𝕃𝕚𝕧𝕚𝕟𝕘
4️⃣2️⃣9️⃣ Units of 1 - 3 bedrooms

🌟99 Years Lease Commence From 12/01/2021🌟

The Reef At King’s Dock Attractive Indicative Price

⭐1️⃣ Br SOLD OUT! 💯
⭐1️⃣ +S SOLD OUT! 💯
⭐2️⃣ Br SOLD OUT! 💯
⭐2️⃣ +S SOLD OUT! 💯
⭐2️⃣ Br Premium fr $2.25M($2,549psf)🔥
⭐2️⃣ Br Villa fr $2.37M ($2,185psf)🔥
⭐3️⃣ +S fr $2.67M ($2,475psf)🔥
⭐3️⃣ Br Premium fr $2.82M($2,317psf)🔥
⭐3️⃣ Br Villa fr $3.59M ($2,668psf)🔥


🔸True Waterfront Living
🔹Right In The Heart of Great Southern Waterfront
🔸Next to Singapore Largest Mall, VivoCity
🔹Seamlessly Connected to Harbourfront MRT
🔸First Mover Advantage With High Potential Upside
🔹By Reputable Developers Mapletree And Keppel Land


Viewing by Appointment
Chat with us Now to find out more!